Special Issue/2019
A. V. Kuzovkov, V. V. Ivanov
MPW reticle floorplanning method for low-volume production
MPW reticle floorplanning method for low-volume production
The paper describes reticle floorplanning method for MPW projects. The method allows minimizing dicing conflicts count between dies and thus minimizes wafer consumption for production.
The paper describes reticle floorplanning method for MPW projects. The method allows minimizing dicing conflicts count between dies and thus minimizes wafer consumption for production.
Readers feedback